by ADMIN | Sep 12, 2024 | News
Following the introduction of the Licensing Regulation for Solar Power Plant 2024 in May 2024, developers must apply for a License or Exemption of License to construct, operate, and maintain their plants, with clear roles outlined for the BPC. In order to ensure ESD...
by ADMIN | Aug 16, 2024 | News
The Honorable Minister of the Ministry of Energy and Natural Resources officially launched the ERA Strategic Plan 2024-2029, the Licensing Regulation for Solar Power Plant 2024, and the Distribution Power Reliability and Transmission System Performance Report 2024 on...
by ADMIN | Jun 21, 2024 | News
Recognizing the importance of creating awareness of the regulatory frameworks of the power sector, the Electricity Regulatory Authority conducted the “Regulatory Sensitization Workshop” on 13th-14th June 2024 at Olathang Cottage, Paro as an annual...
by ADMIN | May 21, 2024 | Notifications
The Electricity Regulatory Authority (ERA) has conducted a detailed study of the power outages in the distribution and transmission system of BPC and determined the preliminary baseline for power reliability indices and transmission system performance for the year...
by ADMIN | Apr 25, 2024 | News
The Electricity Regulatory Authority (ERA) conducted a stakeholder consultation meeting on April 25, 2024, at Druk Hotel on the License Exemption Regulation of Solar Power Plants. The stakeholder presents were from Department of Energy (DoE, MoENR), Department of...
Recent Comments