












Sonam Yangden Wangchuck (2)
solar 2
solar 1
safty
Gemini_Generated_Image_fkgwt6fkgwt6fkgw
Profit
Happy 118th National Day-min
CD
On this sacred day, the Electricity Regulatory Authority joins the nation in honoring the enduring legacy of Zhabdrung Rinpoche. His profound wisdom and visionary leadership continue to inspire ou (1)
objectives
69th Birth Anniversary
4
Copy of Happy Birthday Wishes (1)1
Latest News
A significant milestone was marked on 20th May 2025 with the successful conduct of the Salhang Tendrel (groundbreaking) ceremony for the new office Location at Kawajangsa. The ceremony was graced by...
ERA is dedicated to ensuring the safe and secure installation, operation, and maintenance of internal house wiring across the country. The final task force consultation meeting on the “Internal House...
We are thrilled to welcome two new members to our team. Looking forward to achieving great things together!...
On this special occasion, we the ERA family offer our deepest gratitude for your visionary leadership and tireless service to the people of Bhutan. May your reign continue to be blessed with good...
Electricity Regulatory Authority (ERA) conducted a stakeholder consultation on the Distribution Code (Amendment) Regulation 2025 on 20th February 2025. The consultation was aimed to provide clarity on...
The Electricity Regulatory Authority has revised the Accounting and Reporting Regulation 2007. The updated regulation, now referred to as the Regulatory Reporting Regulation 2025 was approved during...
This is to notify the public that the Electricity Regulatory Authority (ERA) has received the domestic generation tariff proposal from the Druk Green Power Corporation (DGPC) for the 18 MW Suchhu...
The Electricity Regulatory Authority (ERA) has conducted a detailed study of the power outages in the distribution and transmission system of BPC and determined the preliminary baseline for power...
The Electricity Regulatory Authority (ERA) received the application for a generation tariff from Druk Green Power Corporation (DGPC) for the 118 MW Tangsibji Hydro Energy Limited (THyE), for the...
The Appendix A – Compensation for Failure to Meet Standards (GSL) of Performance outlined in the Distribution Code 2022 has been revised following approval from the Electricity Regulatory Authority...
In accordance with the powers conferred under Section 8.1.2 of the Grid Code Regulation 2008, the Electricity Regulatory Authority hereby announces the amendment of the Bhutan Electricity Authority...
No posts found.
No posts found.
AWARNESS
Awareness on Electrical Safety in House Wiring
Prevent Electrical Fire at Home
