The Electricity Regulatory Authority (ERA) would like to inform all prospective solar power developers, individuals, institutions, firms, companies and other interested entities that any person or entity intending to develop a grid-connected Solar Power Plant (as prescribed in the table below) is required to obtain the applicable license or exemption from license from ERA before commencing any development, installation or construction activities. The category, capacity range, and corresponding regulatory requirement are provided in the table below Read more