The Electricity Regulatory Authority (ERA) has conducted a detailed study of the power outages in the distribution and transmission system of BPC and determined the preliminary baseline for power reliability indices and transmission system performance for the year 2023. This study also identified the primary root causes for the power outage and outlined the measures to be taken by BPC to reduce undesired outages in the power system. Further, to improve the power reliability, the ERA established reliability indices benchmarks for the Distribution Power Reliability and Transmission System Performance to be achieved by the BPC in the year 2024-2025.Read More
Recent Comments